Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Carburetors, pistons, piston rings, and valves
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $794k 139k
MMBtu
$6.16
- Electrical $523k 11,019k
kWh
$0.051
- Natural Gas $135k 26k
MMBtu
$5.20

124

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 9.7k
MMBtu
7.0%
- Electrical $46k 951k
kWh
8.6%
- Natural Gas $15k -
MMBtu
-
Waste $3.9k
Productivity/Other $16k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $791k 144k
MMBtu
$5.60
- Electrical $527k 11,387k
kWh
$0.049
- Natural Gas $144k 28k
MMBtu
$5.54

63

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 5.8k
MMBtu
4.0%
- Electrical $29k 565k
kWh
5.0%
- Natural Gas $4.1k -
MMBtu
-
Waste -
Productivity/Other $12k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall