Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous industrial and commercial
3+ Characters Required for Products

333

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $352k 64k
MMBtu
$8.42
- Electrical $208k 4,117k
kWh
$0.064
- Natural Gas $71k 22k
MMBtu
$5.89

2,316

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.1k
MMBtu
6.5%
- Electrical $26k 404k
kWh
9.8%
- Natural Gas $5.7k -
MMBtu
-
Waste $7.4k
Productivity/Other $29k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall

307

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $351k 66k
MMBtu
$8.16
- Electrical $208k 4,221k
kWh
$0.063
- Natural Gas $74k 23k
MMBtu
$5.88

1,013

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 2.1k
MMBtu
3.1%
- Electrical $11k 200k
kWh
4.7%
- Natural Gas $1.5k -
MMBtu
-
Waste $1.7k
Productivity/Other $11k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall