ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring and dispensing pumps
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,093k 179k
MMBtu
$6.57
- Electrical $526k 13,303k
kWh
$0.045
- Natural Gas $346k 42k
MMBtu
$7.23

30

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 7.5k
MMBtu
4.2%
- Electrical $27k 728k
kWh
5.5%
- Natural Gas $23k -
MMBtu
-
Waste $4.3k
Productivity/Other $11k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,093k 179k
MMBtu
$6.57
- Electrical $526k 13,303k
kWh
$0.045
- Natural Gas $346k 42k
MMBtu
$7.23

11

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 2.1k
MMBtu
1.2%
- Electrical $8.3k 204k
kWh
1.5%
- Natural Gas $5.2k -
MMBtu
-
Waste $2.3k
Productivity/Other $5.9k
TOTAL $23k