ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment
3+ Characters Required for Products

143

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $556k 82k
MMBtu
$7.53
- Electrical $322k 6,091k
kWh
$0.062
- Natural Gas $114k 20k
MMBtu
$6.03

1,086

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 6.2k
MMBtu
7.6%
- Electrical $38k 607k
kWh
10.0%
- Natural Gas $8.2k -
MMBtu
-
Waste $3.4k
Productivity/Other $29k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall

134

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $551k 83k
MMBtu
$7.39
- Electrical $314k 6,093k
kWh
$0.062
- Natural Gas $118k 20k
MMBtu
$6.04

518

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.9k
MMBtu
3.5%
- Electrical $16k 281k
kWh
4.6%
- Natural Gas $3.8k -
MMBtu
-
Waste $1.4k
Productivity/Other $11k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall