ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Refrigeration and service industry machinery
3+ Characters Required for Products

222

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $464k 70k
MMBtu
$7.42
- Electrical $264k 5,068k
kWh
$0.062
- Natural Gas $99k 18k
MMBtu
$5.54

1,655

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 5.1k
MMBtu
7.3%
- Electrical $34k 495k
kWh
9.8%
- Natural Gas $5.3k -
MMBtu
-
Waste $3.7k
Productivity/Other $28k
TOTAL $84k
*May be negative reflecting an increased cost component required to save energy and costs overall

212

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $456k 70k
MMBtu
$7.33
- Electrical $255k 4,985k
kWh
$0.062
- Natural Gas $101k 18k
MMBtu
$5.55

775

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.3k
MMBtu
3.3%
- Electrical $13k 226k
kWh
4.5%
- Natural Gas $0.7k -
MMBtu
-
Waste $1.3k
Productivity/Other $10k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall