ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Computer terminals
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $282k 42k
MMBtu
$7.22
- Electrical $208k 3,887k
kWh
$0.048
- Natural Gas $12k 1.9k
MMBtu
$4.09

35

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 4.2k
MMBtu
10.0%
- Electrical $25k 407k
kWh
10.5%
- Natural Gas $1.0k -
MMBtu
-
Waste $22k
Productivity/Other $11k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $282k 42k
MMBtu
$7.22
- Electrical $208k 3,887k
kWh
$0.048
- Natural Gas $12k 1.9k
MMBtu
$4.09

28

Implemented Recommendations

5.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 3.6k
MMBtu
8.6%
- Electrical $24k 352k
kWh
9.1%
- Natural Gas $0.3k -
MMBtu
-
Waste $0.0k
Productivity/Other $0.4k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall