ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Computer and office equipment
3+ Characters Required for Products

64

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $419k 66k
MMBtu
$7.94
- Electrical $322k 5,664k
kWh
$0.065
- Natural Gas $51k 7.4k
MMBtu
$5.04

442

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 5.4k
MMBtu
8.2%
- Electrical $37k 529k
kWh
9.3%
- Natural Gas $2.6k -
MMBtu
-
Waste $3.8k
Productivity/Other $40k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

62

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $416k 66k
MMBtu
$7.87
- Electrical $319k 5,672k
kWh
$0.065
- Natural Gas $51k 7.4k
MMBtu
$4.97

218

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.7k
MMBtu
4.0%
- Electrical $16k 261k
kWh
4.6%
- Natural Gas $0.9k -
MMBtu
-
Waste $0.5k
Productivity/Other $5.8k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall