ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mechanical power transmission equipment, not elsewhere classified
3+ Characters Required for Products

36

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $552k 91k
MMBtu
$6.93
- Electrical $304k 5,992k
kWh
$0.061
- Natural Gas $153k 25k
MMBtu
$6.06

286

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 6.2k
MMBtu
6.9%
- Electrical $33k 607k
kWh
10.1%
- Natural Gas $18k -
MMBtu
-
Waste $3.2k
Productivity/Other $18k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $552k 91k
MMBtu
$6.93
- Electrical $304k 5,992k
kWh
$0.061
- Natural Gas $153k 25k
MMBtu
$6.06

114

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.4k
MMBtu
1.6%
- Electrical $7.5k 139k
kWh
2.3%
- Natural Gas $7.9k -
MMBtu
-
Waste $2.0k
Productivity/Other $2.0k
TOTAL $21k
*May be negative reflecting an increased cost component required to save energy and costs overall