ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial process furnaces and ovens
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $219k 33k
MMBtu
$7.47
- Electrical $140k 2,444k
kWh
$0.064
- Natural Gas $40k 8.0k
MMBtu
$5.43

179

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.1k
MMBtu
9.3%
- Electrical $21k 302k
kWh
12.3%
- Natural Gas $5.7k -
MMBtu
-
Waste $1.5k
Productivity/Other $15k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $226k 34k
MMBtu
$6.90
- Electrical $145k 2,542k
kWh
$0.062
- Natural Gas $42k 8.3k
MMBtu
$4.80

61

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.8k 0.9k
MMBtu
2.5%
- Electrical $3.8k 85k
kWh
3.4%
- Natural Gas $3.8k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.5k
TOTAL $9.6k
*May be negative reflecting an increased cost component required to save energy and costs overall