ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial process furnaces and ovens
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $222k 33k
MMBtu
$7.57
- Electrical $142k 2,444k
kWh
$0.064
- Natural Gas $40k 7.8k
MMBtu
$5.71

189

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 3.8k
MMBtu
11.5%
- Electrical $26k 370k
kWh
15.1%
- Natural Gas $6.0k -
MMBtu
-
Waste $1.4k
Productivity/Other $17k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

22

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $219k 33k
MMBtu
$7.47
- Electrical $140k 2,444k
kWh
$0.064
- Natural Gas $40k 8.0k
MMBtu
$5.43

64

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.8k 0.9k
MMBtu
2.6%
- Electrical $3.8k 83k
kWh
3.4%
- Natural Gas $3.7k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.5k
TOTAL $9.6k