ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC General industrial machinery and equipment
3+ Characters Required for Products

428

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $409k 68k
MMBtu
$7.14
- Electrical $246k 5,103k
kWh
$0.060
- Natural Gas $78k 15k
MMBtu
$6.16

3,267

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 5.6k
MMBtu
8.2%
- Electrical $32k 547k
kWh
10.7%
- Natural Gas $8.5k -
MMBtu
-
Waste $2.8k
Productivity/Other $26k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

421

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $413k 69k
MMBtu
$7.07
- Electrical $248k 5,168k
kWh
$0.060
- Natural Gas $79k 15k
MMBtu
$6.10

1,477

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.0k
MMBtu
2.9%
- Electrical $12k 198k
kWh
3.8%
- Natural Gas $3.3k -
MMBtu
-
Waste $1.0k
Productivity/Other $10k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall