ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC General industrial machinery and equipment
3+ Characters Required for Products

440

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $407k 67k
MMBtu
$7.24
- Electrical $244k 5,038k
kWh
$0.060
- Natural Gas $77k 15k
MMBtu
$6.22

3,349

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 5.6k
MMBtu
8.4%
- Electrical $32k 551k
kWh
10.9%
- Natural Gas $8.4k -
MMBtu
-
Waste $2.7k
Productivity/Other $26k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

426

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $410k 68k
MMBtu
$7.11
- Electrical $246k 5,119k
kWh
$0.060
- Natural Gas $78k 15k
MMBtu
$6.11

1,487

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.0k
MMBtu
2.9%
- Electrical $12k 196k
kWh
3.8%
- Natural Gas $3.2k -
MMBtu
-
Waste $1.0k
Productivity/Other $9.9k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall