Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Food products machinery
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $139k 27k
MMBtu
$5.18
- Electrical $73k 2,257k
kWh
$0.032
- Natural Gas $21k 3.6k
MMBtu
$5.94

6

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.9k 1.4k
MMBtu
5.3%
- Electrical $4.4k 137k
kWh
6.1%
- Natural Gas $4.0k -
MMBtu
-
Waste $1.2k
Productivity/Other $9.4k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $139k 27k
MMBtu
$5.18
- Electrical $73k 2,257k
kWh
$0.032
- Natural Gas $21k 3.6k
MMBtu
$5.94

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.5k 1.3k
MMBtu
5.0%
- Electrical $4.1k 129k
kWh
5.7%
- Natural Gas $4.0k -
MMBtu
-
Waste $1.2k
Productivity/Other $5.8k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall