Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Textile machinery
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $236k 38k
MMBtu
$7.20
- Electrical $147k 2,317k
kWh
$0.067
- Natural Gas $48k 9.3k
MMBtu
$4.15

127

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.2k
MMBtu
8.3%
- Electrical $20k 308k
kWh
13.3%
- Natural Gas $9.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $7.1k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $236k 38k
MMBtu
$7.20
- Electrical $147k 2,317k
kWh
$0.067
- Natural Gas $48k 9.3k
MMBtu
$4.15

68

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.7k
MMBtu
4.5%
- Electrical $10k 167k
kWh
7.2%
- Natural Gas $8.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $2.1k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall