ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric and gas welding and soldering equipment
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $305k 56k
MMBtu
$7.03
- Electrical $205k 4,032k
kWh
$0.056
- Natural Gas $65k 14k
MMBtu
$5.17

99

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 3.3k
MMBtu
5.9%
- Electrical $20k 319k
kWh
7.9%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other $23k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $305k 56k
MMBtu
$7.03
- Electrical $205k 4,032k
kWh
$0.056
- Natural Gas $65k 14k
MMBtu
$5.17

51

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.0k
MMBtu
3.6%
- Electrical $12k 195k
kWh
4.8%
- Natural Gas $5.8k -
MMBtu
-
Waste -
Productivity/Other $0.9k
TOTAL $23k
*May be negative reflecting an increased cost component required to save energy and costs overall