ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Power-driven handtools
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $729k 118k
MMBtu
$6.43
- Electrical $424k 9,484k
kWh
$0.047
- Natural Gas $136k 21k
MMBtu
$5.31

106

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 7.2k
MMBtu
6.1%
- Electrical $32k 704k
kWh
7.4%
- Natural Gas $12k -
MMBtu
-
Waste $0.4k
Productivity/Other $5.4k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $729k 118k
MMBtu
$6.43
- Electrical $424k 9,484k
kWh
$0.047
- Natural Gas $136k 21k
MMBtu
$5.31

51

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 4.4k
MMBtu
3.7%
- Electrical $19k 430k
kWh
4.5%
- Natural Gas $11k -
MMBtu
-
Waste $0.1k
Productivity/Other $1.1k
TOTAL $34k