ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Machine tools, metal forming types
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $413k 59k
MMBtu
$7.15
- Electrical $259k 4,589k
kWh
$0.061
- Natural Gas $70k 12k
MMBtu
$5.56

228

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 4.6k
MMBtu
7.8%
- Electrical $23k 448k
kWh
9.8%
- Natural Gas $16k -
MMBtu
-
Waste $2.0k
Productivity/Other $13k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $413k 59k
MMBtu
$7.15
- Electrical $259k 4,589k
kWh
$0.061
- Natural Gas $70k 12k
MMBtu
$5.56

123

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.7k
MMBtu
4.6%
- Electrical $13k 262k
kWh
5.7%
- Natural Gas $13k -
MMBtu
-
Waste $1.9k
Productivity/Other $8.1k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall