ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Machine tools, metal forming types
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $140k 22k
MMBtu
$6.40
- Electrical $113k 1,937k
kWh
$0.058
- Natural Gas -
-
MMBtu
-

9

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.4k 0.6k
MMBtu
2.7%
- Electrical $3.4k 58k
kWh
3.0%
- Natural Gas -
-
MMBtu
-
Waste $7.5k
Productivity/Other $8.1k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $140k 22k
MMBtu
$6.40
- Electrical $113k 1,937k
kWh
$0.058
- Natural Gas -
-
MMBtu
-

6

Implemented Recommendations

6.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.1k 0.4k
MMBtu
1.6%
- Electrical $2.0k 35k
kWh
1.8%
- Natural Gas -
-
MMBtu
-
Waste $6.1k
Productivity/Other $8.1k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall