ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metalworking machinery and equipment
3+ Characters Required for Products

277

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $328k 49k
MMBtu
$7.61
- Electrical $228k 3,935k
kWh
$0.064
- Natural Gas $40k 7.3k
MMBtu
$5.54

1,933

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.5k
MMBtu
7.3%
- Electrical $21k 345k
kWh
8.8%
- Natural Gas $6.1k -
MMBtu
-
Waste $1.8k
Productivity/Other $30k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall

274

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $310k 47k
MMBtu
$7.56
- Electrical $210k 3,748k
kWh
$0.064
- Natural Gas $40k 7.3k
MMBtu
$5.52

931

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.7k
MMBtu
3.6%
- Electrical $10k 166k
kWh
4.4%
- Natural Gas $3.6k -
MMBtu
-
Waste $1.1k
Productivity/Other $16k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall