ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Conveyors and conveying equipment
3+ Characters Required for Products

48

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $201k 32k
MMBtu
$7.23
- Electrical $113k 2,124k
kWh
$0.059
- Natural Gas $50k 9.7k
MMBtu
$5.20

349

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 1.9k
MMBtu
6.1%
- Electrical $10k 188k
kWh
8.8%
- Natural Gas $5.9k -
MMBtu
-
Waste $3.7k
Productivity/Other $14k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall

48

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $201k 32k
MMBtu
$7.23
- Electrical $113k 2,124k
kWh
$0.059
- Natural Gas $50k 9.7k
MMBtu
$5.20

154

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.6k 0.7k
MMBtu
2.4%
- Electrical $3.9k 73k
kWh
3.4%
- Natural Gas $1.8k -
MMBtu
-
Waste $1.0k
Productivity/Other $5.3k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall