The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 3535 Conveyors and conveying equipment

49

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $200k 31k
MMBtu
$7.21
- Electrical $111k 2,093k
kWh
$0.059
- Natural Gas $50k 9.7k
MMBtu
$5.18

357

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.0k
MMBtu
6.3%
- Electrical $10k 191k
kWh
9.1%
- Natural Gas $6.3k -
MMBtu
-
Waste $3.7k
Productivity/Other $14k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall

48

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $201k 32k
MMBtu
$7.23
- Electrical $113k 2,124k
kWh
$0.059
- Natural Gas $50k 9.7k
MMBtu
$5.20

154

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.6k 0.7k
MMBtu
2.4%
- Electrical $3.9k 73k
kWh
3.4%
- Natural Gas $1.8k -
MMBtu
-
Waste $1.0k
Productivity/Other $5.3k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall