ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 3532 Mining machinery and equipment, except oil and gas field machinery and equipment

38

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $394k 52k
MMBtu
$9.00
- Electrical $217k 3,279k
kWh
$0.79
- Natural Gas $98k 18k
MMBtu
$5.68

306

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 3.7k
MMBtu
7.1%
- Electrical $27k 361k
kWh
11.0%
- Natural Gas $18k -
MMBtu
-
Waste $5.4k
Productivity/Other $22k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $399k 54k
MMBtu
$8.92
- Electrical $219k 3,326k
kWh
$0.83
- Natural Gas $101k 18k
MMBtu
$5.50

152

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.9k
MMBtu
3.5%
- Electrical $10k 181k
kWh
5.4%
- Natural Gas $5.6k -
MMBtu
-
Waste $3.1k
Productivity/Other $7.4k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall