ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction, mining, and materials handling
3+ Characters Required for Products

364

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $411k 91k
MMBtu
$7.11
- Electrical $234k 5,743k
kWh
$0.13
- Natural Gas $104k 20k
MMBtu
$5.33

2,781

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 5.2k
MMBtu
5.7%
- Electrical $30k 508k
kWh
8.8%
- Natural Gas $15k -
MMBtu
-
Waste $3.6k
Productivity/Other $31k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

353

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $411k 93k
MMBtu
$7.02
- Electrical $235k 5,832k
kWh
$0.14
- Natural Gas $105k 20k
MMBtu
$5.24

1,293

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.6k
MMBtu
2.8%
- Electrical $14k 252k
kWh
4.3%
- Natural Gas $6.0k -
MMBtu
-
Waste $1.2k
Productivity/Other $16k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall