ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Farm machinery and equipment
3+ Characters Required for Products

86

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $400k 69k
MMBtu
$6.96
- Electrical $196k 3,926k
kWh
$0.058
- Natural Gas $152k 28k
MMBtu
$5.01

636

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.6k
MMBtu
5.2%
- Electrical $20k 350k
kWh
8.9%
- Natural Gas $7.8k -
MMBtu
-
Waste $2.0k
Productivity/Other $24k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall

85

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $401k 69k
MMBtu
$6.96
- Electrical $197k 3,948k
kWh
$0.059
- Natural Gas $153k 28k
MMBtu
$5.02

329

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.8k
MMBtu
2.6%
- Electrical $8.8k 179k
kWh
4.5%
- Natural Gas $5.5k -
MMBtu
-
Waste $0.8k
Productivity/Other $9.6k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall