ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Farm and garden machinery and equipment
3+ Characters Required for Products

115

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $405k 70k
MMBtu
$6.78
- Electrical $209k 4,344k
kWh
$0.057
- Natural Gas $133k 25k
MMBtu
$4.94

864

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 3.9k
MMBtu
5.6%
- Electrical $20k 381k
kWh
8.8%
- Natural Gas $7.4k -
MMBtu
-
Waste $5.7k
Productivity/Other $27k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall

114

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $406k 70k
MMBtu
$6.78
- Electrical $210k 4,364k
kWh
$0.057
- Natural Gas $133k 25k
MMBtu
$4.95

436

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.9k
MMBtu
2.7%
- Electrical $8.8k 185k
kWh
4.2%
- Natural Gas $4.3k -
MMBtu
-
Waste $2.0k
Productivity/Other $9.4k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall