The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC | 3511 | Steam, gas, and hydraulic turbines, and turbine generator set units |
27
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $728k | 100k |
MMBtu
|
$9.62 |
- Electrical | $459k | 8,477k |
kWh
|
$0.070 |
- Natural Gas | $72k | 11k |
MMBtu
|
$5.23 |
230
Recommendations
8.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $96k | 11k |
MMBtu
|
10.7% |
- Electrical | $73k | 1,040k |
kWh
|
12.3% |
- Natural Gas | $3.2k | - |
MMBtu
|
- |
Waste | $2.3k | |||
Productivity/Other | $14k | |||
TOTAL | $113k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
26
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $736k | 103k |
MMBtu
|
$9.07 |
- Electrical | $466k | 8,738k |
kWh
|
$0.066 |
- Natural Gas | $73k | 12k |
MMBtu
|
$5.14 |
96
Implemented Recommendations
3.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $33k | 4.4k |
MMBtu
|
4.3% |
- Electrical | $29k | 429k |
kWh
|
4.9% |
- Natural Gas | ($-0.2)k | - |
MMBtu
|
- |
Waste | $0.6k | |||
Productivity/Other | $0.1k | |||
TOTAL | $34k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |