ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Engines and turbines
3+ Characters Required for Products

72

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $806k 116k
MMBtu
$8.34
- Electrical $469k 8,648k
kWh
$0.060
- Natural Gas $155k 27k
MMBtu
$5.68

562

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $113k 11k
MMBtu
9.4%
- Electrical $69k 1,067k
kWh
12.3%
- Natural Gas $21k -
MMBtu
-
Waste $15k
Productivity/Other $18k
TOTAL $146k
*May be negative reflecting an increased cost component required to save energy and costs overall

66

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $783k 116k
MMBtu
$8.28
- Electrical $452k 8,500k
kWh
$0.060
- Natural Gas $157k 28k
MMBtu
$5.37

264

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.8k
MMBtu
4.1%
- Electrical $27k 464k
kWh
5.5%
- Natural Gas $5.5k -
MMBtu
-
Waste $13k
Productivity/Other $8.8k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall