ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial and commercial machinery and computer equipment
3+ Characters Required for Products

2,073

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $396k 69k
MMBtu
$7.49
- Electrical $236k 4,790k
kWh
$0.074
- Natural Gas $83k 17k
MMBtu
$5.62

15,298

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.7k
MMBtu
6.9%
- Electrical $29k 461k
kWh
9.6%
- Natural Gas $8.7k -
MMBtu
-
Waste $4.3k
Productivity/Other $27k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,999

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $393k 69k
MMBtu
$7.34
- Electrical $233k 4,805k
kWh
$0.074
- Natural Gas $84k 17k
MMBtu
$5.54

7,099

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.2k
MMBtu
3.1%
- Electrical $12k 210k
kWh
4.4%
- Natural Gas $3.3k -
MMBtu
-
Waste $1.7k
Productivity/Other $11k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall