ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial and commercial machinery and computer equipment
3+ Characters Required for Products

2,087

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $396k 69k
MMBtu
$7.52
- Electrical $236k 4,780k
kWh
$0.075
- Natural Gas $83k 17k
MMBtu
$5.64

15,384

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.8k
MMBtu
6.9%
- Electrical $29k 464k
kWh
9.7%
- Natural Gas $8.7k -
MMBtu
-
Waste $4.3k
Productivity/Other $27k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

2,021

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $396k 69k
MMBtu
$7.39
- Electrical $236k 4,824k
kWh
$0.074
- Natural Gas $84k 17k
MMBtu
$5.55

7,169

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.2k
MMBtu
3.1%
- Electrical $12k 210k
kWh
4.3%
- Natural Gas $3.3k -
MMBtu
-
Waste $1.7k
Productivity/Other $11k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall