ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated pipe and pipe fittings
3+ Characters Required for Products

70

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $318k 55k
MMBtu
$7.02
- Electrical $171k 3,162k
kWh
$0.061
- Natural Gas $88k 21k
MMBtu
$4.73

533

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.4k
MMBtu
6.1%
- Electrical $21k 328k
kWh
10.4%
- Natural Gas $4.4k -
MMBtu
-
Waste $2.8k
Productivity/Other $45k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall

68

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $323k 56k
MMBtu
$6.64
- Electrical $174k 3,235k
kWh
$0.059
- Natural Gas $91k 22k
MMBtu
$4.60

238

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.0k
MMBtu
3.6%
- Electrical $12k 198k
kWh
6.1%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.9k
Productivity/Other $11k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall