ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous fabricated wire products
3+ Characters Required for Products

86

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $545k 82k
MMBtu
$7.49
- Electrical $267k 4,897k
kWh
$0.065
- Natural Gas $190k 32k
MMBtu
$5.45

673

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 6.5k
MMBtu
7.9%
- Electrical $37k 634k
kWh
12.9%
- Natural Gas $15k -
MMBtu
-
Waste $4.7k
Productivity/Other $30k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

83

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $543k 83k
MMBtu
$7.18
- Electrical $266k 4,937k
kWh
$0.063
- Natural Gas $193k 32k
MMBtu
$5.46

277

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.1k
MMBtu
2.6%
- Electrical $13k 208k
kWh
4.2%
- Natural Gas $2.5k -
MMBtu
-
Waste $1.2k
Productivity/Other $1.6k
TOTAL $21k
*May be negative reflecting an increased cost component required to save energy and costs overall