ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wire springs
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $566k 155k
MMBtu
$3.65
- Electrical $324k 6,250k
kWh
$0.052
- Natural Gas $243k 91k
MMBtu
$2.66

8

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 2.7k
MMBtu
1.8%
- Electrical $15k 268k
kWh
4.3%
- Natural Gas $25k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $566k 155k
MMBtu
$3.65
- Electrical $324k 6,250k
kWh
$0.052
- Natural Gas $243k 91k
MMBtu
$2.66

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.2k
MMBtu
0.8%
- Electrical $6.0k 115k
kWh
1.8%
- Natural Gas $8.3k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall