ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fluid power valves and hose fittings
3+ Characters Required for Products

51

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $430k 55k
MMBtu
$8.49
- Electrical $281k 4,784k
kWh
$0.067
- Natural Gas $38k 5.6k
MMBtu
$5.60

424

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 7.1k
MMBtu
13.0%
- Electrical $44k 694k
kWh
14.5%
- Natural Gas $7.6k -
MMBtu
-
Waste $3.1k
Productivity/Other $31k
TOTAL $110k
*May be negative reflecting an increased cost component required to save energy and costs overall

46

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $412k 55k
MMBtu
$7.83
- Electrical $274k 4,840k
kWh
$0.062
- Natural Gas $27k 4.9k
MMBtu
$5.22

157

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 3.1k
MMBtu
5.7%
- Electrical $17k 301k
kWh
6.2%
- Natural Gas $2.3k -
MMBtu
-
Waste $1.5k
Productivity/Other $5.3k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall