ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial valves
3+ Characters Required for Products

61

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $477k 68k
MMBtu
$8.28
- Electrical $308k 5,513k
kWh
$0.066
- Natural Gas $55k 11k
MMBtu
$5.68

467

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 6.8k
MMBtu
9.9%
- Electrical $40k 660k
kWh
12.0%
- Natural Gas ($-0.1)k -
MMBtu
-
Waste $1.8k
Productivity/Other $37k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall

57

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $410k 60k
MMBtu
$8.11
- Electrical $261k 4,894k
kWh
$0.064
- Natural Gas $44k 9.6k
MMBtu
$5.26

220

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 3.0k
MMBtu
5.0%
- Electrical $15k 297k
kWh
6.1%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.4k
Productivity/Other $8.2k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall