ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous fabricated metal products
3+ Characters Required for Products

668

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $426k 64k
MMBtu
$7.71
- Electrical $242k 4,308k
kWh
$0.064
- Natural Gas $97k 19k
MMBtu
$5.51

5,202

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 5.6k
MMBtu
8.7%
- Electrical $35k 542k
kWh
12.6%
- Natural Gas $7.9k -
MMBtu
-
Waste $4.3k
Productivity/Other $36k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall

642

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $423k 64k
MMBtu
$7.50
- Electrical $241k 4,309k
kWh
$0.063
- Natural Gas $98k 19k
MMBtu
$5.41

2,344

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.3k
MMBtu
3.6%
- Electrical $13k 227k
kWh
5.3%
- Natural Gas $3.0k -
MMBtu
-
Waste $1.8k
Productivity/Other $7.9k
TOTAL $30k