ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Small arms ammunition
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $805k 111k
MMBtu
$7.71
- Electrical $422k 7,453k
kWh
$0.058
- Natural Gas $252k 34k
MMBtu
$6.67

64

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 6.0k
MMBtu
5.4%
- Electrical $34k 584k
kWh
7.8%
- Natural Gas $11k -
MMBtu
-
Waste $0.4k
Productivity/Other $13k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $805k 111k
MMBtu
$7.71
- Electrical $422k 7,453k
kWh
$0.058
- Natural Gas $252k 34k
MMBtu
$6.67

30

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.9k
MMBtu
3.5%
- Electrical $21k 380k
kWh
5.1%
- Natural Gas $2.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $12k
TOTAL $42k