ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ordnance and accessories, except vehicles and guided missiles
3+ Characters Required for Products

48

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $728k 108k
MMBtu
$7.89
- Electrical $436k 6,905k
kWh
$0.068
- Natural Gas $159k 29k
MMBtu
$4.34

364

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 6.6k
MMBtu
6.2%
- Electrical $42k 646k
kWh
9.4%
- Natural Gas $13k -
MMBtu
-
Waste $4.0k
Productivity/Other $52k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall

48

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $728k 108k
MMBtu
$7.89
- Electrical $436k 6,905k
kWh
$0.068
- Natural Gas $159k 29k
MMBtu
$4.34

141

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.3k
MMBtu
2.1%
- Electrical $15k 225k
kWh
3.3%
- Natural Gas $3.2k -
MMBtu
-
Waste $1.7k
Productivity/Other $6.3k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall