ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electroplating, plating, polishing, anodizing, and coloring
3+ Characters Required for Products

204

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $369k 59k
MMBtu
$7.73
- Electrical $173k 3,018k
kWh
$0.069
- Natural Gas $135k 27k
MMBtu
$6.38

1,536

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.3k
MMBtu
7.3%
- Electrical $27k 422k
kWh
14.0%
- Natural Gas $10k -
MMBtu
-
Waste $11k
Productivity/Other $15k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall

197

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $375k 60k
MMBtu
$7.63
- Electrical $176k 3,082k
kWh
$0.068
- Natural Gas $138k 28k
MMBtu
$6.34

804

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 1.7k
MMBtu
2.9%
- Electrical $11k 169k
kWh
5.5%
- Natural Gas $6.7k -
MMBtu
-
Waste $3.7k
Productivity/Other $2.8k
TOTAL $26k
*May be negative reflecting an increased cost component required to save energy and costs overall