ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Coating, engraving, and allied services
3+ Characters Required for Products

356

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $460k 74k
MMBtu
$7.92
- Electrical $195k 3,545k
kWh
$0.071
- Natural Gas $185k 37k
MMBtu
$6.39

2,690

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 5.1k
MMBtu
6.9%
- Electrical $34k 502k
kWh
14.2%
- Natural Gas $17k -
MMBtu
-
Waste $8.6k
Productivity/Other $15k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

337

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $460k 76k
MMBtu
$7.76
- Electrical $196k 3,634k
kWh
$0.070
- Natural Gas $185k 38k
MMBtu
$6.35

1,338

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.7k
MMBtu
2.2%
- Electrical $10k 162k
kWh
4.5%
- Natural Gas $7.8k -
MMBtu
-
Waste $3.8k
Productivity/Other $4.2k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall