ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Coating, engraving, and allied services
3+ Characters Required for Products

377

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $469k 75k
MMBtu
$8.16
- Electrical $194k 3,503k
kWh
$0.072
- Natural Gas $191k 38k
MMBtu
$6.62

2,865

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 5.0k
MMBtu
6.7%
- Electrical $34k 492k
kWh
14.0%
- Natural Gas $20k -
MMBtu
-
Waste $8.4k
Productivity/Other $17k
TOTAL $91k
*May be negative reflecting an increased cost component required to save energy and costs overall

352

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $464k 75k
MMBtu
$7.85
- Electrical $196k 3,584k
kWh
$0.071
- Natural Gas $187k 38k
MMBtu
$6.41

1,388

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.6k
MMBtu
2.1%
- Electrical $9.9k 153k
kWh
4.3%
- Natural Gas $8.6k -
MMBtu
-
Waste $3.6k
Productivity/Other $6.0k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall