ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Coating, engraving, and allied services
3+ Characters Required for Products

369

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $457k 74k
MMBtu
$8.09
- Electrical $193k 3,489k
kWh
$0.072
- Natural Gas $184k 37k
MMBtu
$6.63

2,802

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $62k 5.1k
MMBtu
6.9%
- Electrical $34k 493k
kWh
14.1%
- Natural Gas $17k -
MMBtu
-
Waste $8.3k
Productivity/Other $17k
TOTAL $87k
*May be negative reflecting an increased cost component required to save energy and costs overall

348

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $466k 76k
MMBtu
$7.86
- Electrical $197k 3,600k
kWh
$0.070
- Natural Gas $188k 38k
MMBtu
$6.44

1,381

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.6k
MMBtu
2.1%
- Electrical $10k 158k
kWh
4.4%
- Natural Gas $8.2k -
MMBtu
-
Waste $3.7k
Productivity/Other $4.6k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall