ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal stampings, not elsewhere classified
3+ Characters Required for Products

120

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $338k 57k
MMBtu
$7.70
- Electrical $175k 3,387k
kWh
$0.065
- Natural Gas $91k 21k
MMBtu
$6.16

972

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 3.3k
MMBtu
5.8%
- Electrical $19k 322k
kWh
9.5%
- Natural Gas $11k -
MMBtu
-
Waste $4.1k
Productivity/Other $72k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

117

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $334k 57k
MMBtu
$7.67
- Electrical $171k 3,364k
kWh
$0.064
- Natural Gas $92k 22k
MMBtu
$6.10

460

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.6k
MMBtu
2.8%
- Electrical $8.9k 156k
kWh
4.6%
- Natural Gas $5.6k -
MMBtu
-
Waste $0.8k
Productivity/Other $56k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall