ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal stampings, not elsewhere classified
3+ Characters Required for Products

121

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $336k 56k
MMBtu
$7.70
- Electrical $174k 3,373k
kWh
$0.064
- Natural Gas $90k 21k
MMBtu
$6.18

979

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 3.3k
MMBtu
5.9%
- Electrical $19k 322k
kWh
9.6%
- Natural Gas $11k -
MMBtu
-
Waste $4.1k
Productivity/Other $71k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

118

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $333k 56k
MMBtu
$7.66
- Electrical $171k 3,348k
kWh
$0.064
- Natural Gas $92k 22k
MMBtu
$6.08

465

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.6k
MMBtu
2.8%
- Electrical $9.0k 156k
kWh
4.7%
- Natural Gas $5.6k -
MMBtu
-
Waste $0.8k
Productivity/Other $55k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall