ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive stampings
3+ Characters Required for Products

91

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $769k 126k
MMBtu
$7.18
- Electrical $477k 8,898k
kWh
$0.058
- Natural Gas $132k 25k
MMBtu
$7.52

677

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 11k
MMBtu
8.7%
- Electrical $65k 1,072k
kWh
12.0%
- Natural Gas $12k -
MMBtu
-
Waste $1.4k
Productivity/Other $22k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

84

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $749k 124k
MMBtu
$7.08
- Electrical $453k 8,792k
kWh
$0.057
- Natural Gas $139k 24k
MMBtu
$7.28

236

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.3k
MMBtu
1.8%
- Electrical $12k 223k
kWh
2.5%
- Natural Gas $5.4k -
MMBtu
-
Waste $0.4k
Productivity/Other $15k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall