ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonferrous forgings
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $962k 146k
MMBtu
$7.71
- Electrical $369k 6,045k
kWh
$0.069
- Natural Gas $435k 84k
MMBtu
$9.56

164

Recommendations

9.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $125k 25k
MMBtu
16.8%
- Electrical $164k 2,393k
kWh
39.6%
- Natural Gas ($-59.0)k -
MMBtu
-
Waste $0.6k
Productivity/Other $295k
TOTAL $421k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $962k 146k
MMBtu
$7.71
- Electrical $369k 6,045k
kWh
$0.069
- Natural Gas $435k 84k
MMBtu
$9.56

61

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.2k
MMBtu
1.5%
- Electrical $18k 213k
kWh
3.5%
- Natural Gas $3.3k -
MMBtu
-
Waste $0.4k
Productivity/Other $19k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall