ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal forgings and stampings
3+ Characters Required for Products

331

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $744k 128k
MMBtu
$7.23
- Electrical $359k 6,979k
kWh
$0.13
- Natural Gas $250k 54k
MMBtu
$6.26

2,639

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 8.2k
MMBtu
6.4%
- Electrical $46k 797k
kWh
11.4%
- Natural Gas $23k -
MMBtu
-
Waste $3.0k
Productivity/Other $59k
TOTAL $150k
*May be negative reflecting an increased cost component required to save energy and costs overall

320

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $737k 128k
MMBtu
$7.21
- Electrical $353k 6,921k
kWh
$0.13
- Natural Gas $252k 54k
MMBtu
$6.29

1,137

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.6k
MMBtu
2.0%
- Electrical $14k 249k
kWh
3.6%
- Natural Gas $8.1k -
MMBtu
-
Waste $0.7k
Productivity/Other $28k
TOTAL $57k