ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Screw machine products
3+ Characters Required for Products

54

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $314k 38k
MMBtu
$8.97
- Electrical $220k 3,259k
kWh
$0.073
- Natural Gas $31k 4.7k
MMBtu
$8.56

415

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.1k
MMBtu
10.8%
- Electrical $32k 403k
kWh
12.4%
- Natural Gas $3.2k -
MMBtu
-
Waste $2.8k
Productivity/Other $70k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

52

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $318k 39k
MMBtu
$8.60
- Electrical $223k 3,328k
kWh
$0.072
- Natural Gas $32k 4.9k
MMBtu
$8.36

183

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.1k
MMBtu
5.4%
- Electrical $17k 207k
kWh
6.2%
- Natural Gas $1.8k -
MMBtu
-
Waste $0.9k
Productivity/Other $41k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall