ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Screw machine products
3+ Characters Required for Products

51

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $314k 39k
MMBtu
$8.54
- Electrical $222k 3,323k
kWh
$0.072
- Natural Gas $32k 4.9k
MMBtu
$8.32

382

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 4.0k
MMBtu
10.3%
- Electrical $31k 392k
kWh
11.8%
- Natural Gas $2.7k -
MMBtu
-
Waste $3.0k
Productivity/Other $73k
TOTAL $116k
*May be negative reflecting an increased cost component required to save energy and costs overall

49

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $306k 38k
MMBtu
$8.53
- Electrical $214k 3,199k
kWh
$0.071
- Natural Gas $33k 4.9k
MMBtu
$8.54

175

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.2k
MMBtu
5.7%
- Electrical $17k 211k
kWh
6.6%
- Natural Gas $1.9k -
MMBtu
-
Waste $1.0k
Productivity/Other $44k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall