ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous structural metal work
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $247k 37k
MMBtu
$8.07
- Electrical $147k 2,469k
kWh
$0.25
- Natural Gas $48k 11k
MMBtu
$5.65

209

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.3k
MMBtu
9.1%
- Electrical $22k 326k
kWh
13.2%
- Natural Gas $6.8k -
MMBtu
-
Waste $1.5k
Productivity/Other $11k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $243k 37k
MMBtu
$7.98
- Electrical $146k 2,440k
kWh
$0.26
- Natural Gas $49k 11k
MMBtu
$5.83

77

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 2.0k
MMBtu
5.4%
- Electrical $13k 192k
kWh
7.9%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.8k
Productivity/Other $0.1k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall