The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 3449 Miscellaneous structural metal work

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $243k 37k
MMBtu
$7.98
- Electrical $146k 2,440k
kWh
$0.26
- Natural Gas $49k 11k
MMBtu
$5.83

202

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.1k
MMBtu
8.4%
- Electrical $21k 300k
kWh
12.3%
- Natural Gas $7.0k -
MMBtu
-
Waste $1.6k
Productivity/Other $11k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $243k 37k
MMBtu
$7.98
- Electrical $146k 2,440k
kWh
$0.26
- Natural Gas $49k 11k
MMBtu
$5.83

77

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 2.0k
MMBtu
5.4%
- Electrical $13k 192k
kWh
7.9%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.8k
Productivity/Other $0.1k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall