ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Prefabricated metal buildings and components
3+ Characters Required for Products

50

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $228k 33k
MMBtu
$7.95
- Electrical $136k 2,365k
kWh
$0.064
- Natural Gas $49k 8.4k
MMBtu
$6.85

376

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.2k
MMBtu
12.7%
- Electrical $30k 408k
kWh
17.3%
- Natural Gas $11k -
MMBtu
-
Waste $17k
Productivity/Other $47k
TOTAL $110k
*May be negative reflecting an increased cost component required to save energy and costs overall

49

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $229k 33k
MMBtu
$7.84
- Electrical $137k 2,397k
kWh
$0.064
- Natural Gas $49k 8.5k
MMBtu
$6.74

177

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.0k
MMBtu
6.1%
- Electrical $16k 197k
kWh
8.2%
- Natural Gas $0.8k -
MMBtu
-
Waste $1.8k
Productivity/Other $30k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall