ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Architectural and ornamental metal work
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $353k 54k
MMBtu
$8.65
- Electrical $185k 3,303k
kWh
$0.073
- Natural Gas $89k 20k
MMBtu
$4.83

160

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.2k
MMBtu
6.0%
- Electrical $19k 316k
kWh
9.6%
- Natural Gas $5.7k -
MMBtu
-
Waste $0.3k
Productivity/Other $10k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $365k 58k
MMBtu
$7.71
- Electrical $187k 3,503k
kWh
$0.065
- Natural Gas $95k 21k
MMBtu
$4.67

56

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.3k
MMBtu
2.2%
- Electrical $7.2k 125k
kWh
3.6%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $1.6k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall