ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated structural metal
3+ Characters Required for Products

173

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $329k 50k
MMBtu
$8.88
- Electrical $198k 3,544k
kWh
$0.072
- Natural Gas $67k 13k
MMBtu
$5.19

1,218

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 5.3k
MMBtu
10.7%
- Electrical $31k 518k
kWh
14.6%
- Natural Gas $4.1k -
MMBtu
-
Waste $2.7k
Productivity/Other $33k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

161

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $340k 52k
MMBtu
$8.38
- Electrical $207k 3,711k
kWh
$0.069
- Natural Gas $71k 14k
MMBtu
$4.98

536

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.6k
MMBtu
3.0%
- Electrical $8.9k 153k
kWh
4.1%
- Natural Gas $1.1k -
MMBtu
-
Waste $1.2k
Productivity/Other $11k
TOTAL $26k
*May be negative reflecting an increased cost component required to save energy and costs overall