ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated structural metal products
3+ Characters Required for Products

814

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $333k 50k
MMBtu
$8.35
- Electrical $186k 3,424k
kWh
$0.076
- Natural Gas $73k 15k
MMBtu
$5.42

5,857

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.0k
MMBtu
8.1%
- Electrical $25k 395k
kWh
11.5%
- Natural Gas $8.0k -
MMBtu
-
Waste $4.9k
Productivity/Other $33k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

776

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $327k 50k
MMBtu
$8.06
- Electrical $184k 3,446k
kWh
$0.075
- Natural Gas $72k 14k
MMBtu
$5.24

2,659

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.7k
MMBtu
3.4%
- Electrical $11k 168k
kWh
4.9%
- Natural Gas $2.8k -
MMBtu
-
Waste $1.2k
Productivity/Other $12k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall