ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Heating equipment, except electric and warm air furnaces
3+ Characters Required for Products

50

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $338k 46k
MMBtu
$6.93
- Electrical $169k 2,524k
kWh
$0.063
- Natural Gas $103k 17k
MMBtu
$5.38

393

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 4.7k
MMBtu
10.3%
- Electrical $36k 463k
kWh
18.3%
- Natural Gas $7.8k -
MMBtu
-
Waste $6.1k
Productivity/Other $37k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

48

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $274k 41k
MMBtu
$6.80
- Electrical $154k 2,246k
kWh
$0.063
- Natural Gas $74k 15k
MMBtu
$5.26

175

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.4k 1.2k
MMBtu
3.0%
- Electrical $6.2k 121k
kWh
5.4%
- Natural Gas $1.4k -
MMBtu
-
Waste $1.1k
Productivity/Other $19k
TOTAL $29k