ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plumbing fixture fittings and trim
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $501k 84k
MMBtu
$6.10
- Electrical $319k 6,301k
kWh
$0.057
- Natural Gas $77k 17k
MMBtu
$4.54

271

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 8.2k
MMBtu
9.7%
- Electrical $43k 797k
kWh
12.6%
- Natural Gas $3.1k -
MMBtu
-
Waste $3.8k
Productivity/Other $23k
TOTAL $87k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $446k 81k
MMBtu
$5.93
- Electrical $285k 5,988k
kWh
$0.057
- Natural Gas $75k 17k
MMBtu
$4.43

116

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 4.2k
MMBtu
5.2%
- Electrical $18k 412k
kWh
6.9%
- Natural Gas ($-0.9)k -
MMBtu
-
Waste $1.7k
Productivity/Other $16k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall