The ITAC Statistics page displays the average assessment results for the selected criteria.
90
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $412k | 66k |
MMBtu
|
$6.51 |
- Electrical | $234k | 4,466k |
kWh
|
$0.060 |
- Natural Gas | $88k | 18k |
MMBtu
|
$5.05 |
730
Recommendations
8.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $57k | 6.3k |
MMBtu
|
9.5% |
- Electrical | $38k | 611k |
kWh
|
13.7% |
- Natural Gas | $5.1k | - |
MMBtu
|
- |
Waste | $5.6k | |||
Productivity/Other | $44k | |||
TOTAL | $107k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
88
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $409k | 66k |
MMBtu
|
$6.49 |
- Electrical | $235k | 4,468k |
kWh
|
$0.060 |
- Natural Gas | $87k | 18k |
MMBtu
|
$5.08 |
335
Implemented Recommendations
3.8
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $17k | 2.6k |
MMBtu
|
3.9% |
- Electrical | $11k | 250k |
kWh
|
5.6% |
- Natural Gas | $0.7k | - |
MMBtu
|
- |
Waste | $1.4k | |||
Productivity/Other | $29k | |||
TOTAL | $47k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |