ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Heating equipment, except electric and warm air;
3+ Characters Required for Products

90

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $412k 66k
MMBtu
$6.51
- Electrical $234k 4,466k
kWh
$0.060
- Natural Gas $88k 18k
MMBtu
$5.05

730

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 6.3k
MMBtu
9.5%
- Electrical $38k 611k
kWh
13.7%
- Natural Gas $5.1k -
MMBtu
-
Waste $5.6k
Productivity/Other $44k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

87

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $385k 64k
MMBtu
$6.44
- Electrical $219k 4,286k
kWh
$0.060
- Natural Gas $86k 18k
MMBtu
$5.04

329

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 2.5k
MMBtu
4.0%
- Electrical $11k 247k
kWh
5.8%
- Natural Gas $0.7k -
MMBtu
-
Waste $1.4k
Productivity/Other $30k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall