The ITAC Statistics page displays the average assessment results for the selected criteria.
94
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $436k | 67k |
MMBtu
|
$6.61 |
- Electrical | $239k | 4,520k |
kWh
|
$0.060 |
- Natural Gas | $100k | 19k |
MMBtu
|
$5.12 |
752
Recommendations
8.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $58k | 6.3k |
MMBtu
|
9.3% |
- Electrical | $38k | 612k |
kWh
|
13.5% |
- Natural Gas | $6.9k | - |
MMBtu
|
- |
Waste | $5.4k | |||
Productivity/Other | $43k | |||
TOTAL | $106k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
90
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $412k | 66k |
MMBtu
|
$6.51 |
- Electrical | $234k | 4,466k |
kWh
|
$0.060 |
- Natural Gas | $88k | 18k |
MMBtu
|
$5.05 |
347
Implemented Recommendations
3.9
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $17k | 2.5k |
MMBtu
|
3.8% |
- Electrical | $11k | 248k |
kWh
|
5.6% |
- Natural Gas | $0.8k | - |
MMBtu
|
- |
Waste | $1.4k | |||
Productivity/Other | $29k | |||
TOTAL | $47k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |