ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hardware, not elsewhere classified
3+ Characters Required for Products

79

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $408k 65k
MMBtu
$7.28
- Electrical $239k 4,331k
kWh
$0.065
- Natural Gas $96k 20k
MMBtu
$4.82

606

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.4k
MMBtu
6.7%
- Electrical $26k 428k
kWh
9.9%
- Natural Gas $10k -
MMBtu
-
Waste $6.7k
Productivity/Other $56k
TOTAL $106k
*May be negative reflecting an increased cost component required to save energy and costs overall

77

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $408k 66k
MMBtu
$7.13
- Electrical $240k 4,394k
kWh
$0.064
- Natural Gas $96k 20k
MMBtu
$4.69

275

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.5k
MMBtu
3.8%
- Electrical $14k 244k
kWh
5.6%
- Natural Gas $4.3k -
MMBtu
-
Waste $3.0k
Productivity/Other $31k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall