ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cutlery
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $431k 66k
MMBtu
$7.62
- Electrical $287k 5,270k
kWh
$0.067
- Natural Gas $53k 10k
MMBtu
$6.56

132

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.7k
MMBtu
5.6%
- Electrical $19k 365k
kWh
6.9%
- Natural Gas $1.4k -
MMBtu
-
Waste $15k
Productivity/Other $13k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $450k 70k
MMBtu
$7.52
- Electrical $302k 5,530k
kWh
$0.068
- Natural Gas $56k 11k
MMBtu
$6.61

61

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.5k 1.0k
MMBtu
1.5%
- Electrical $7.8k 100k
kWh
1.8%
- Natural Gas $0.7k -
MMBtu
-
Waste $0.4k
Productivity/Other $1.0k
TOTAL $11k
*May be negative reflecting an increased cost component required to save energy and costs overall