ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal shipping barrels, drums, kegs, and pails
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $546k 92k
MMBtu
$6.45
- Electrical $261k 3,672k
kWh
$0.073
- Natural Gas $246k 54k
MMBtu
$5.20

211

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 3.1k
MMBtu
3.4%
- Electrical $23k 307k
kWh
8.4%
- Natural Gas $18k -
MMBtu
-
Waste $14k
Productivity/Other $36k
TOTAL $98k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $546k 92k
MMBtu
$6.45
- Electrical $261k 3,672k
kWh
$0.073
- Natural Gas $246k 54k
MMBtu
$5.20

113

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.1k
MMBtu
2.3%
- Electrical $15k 208k
kWh
5.7%
- Natural Gas $5.8k -
MMBtu
-
Waste $13k
Productivity/Other $28k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall